Search Building Permits
3,454 permits · Demolition
Partial demolition of Level 1 through Level 5MER for skylight opening, reframing of new openings, bracing of existing structure, installation of new mechanical openings, framing for new escalator and...
Preparation Work for Full Demolition - Interior Demo
Proposed non-mechanical full demolition of existing garage.
Partial demolition of Level 1 through Level 5MER for skylight opening, reframing of new openings, bracing of existing structure, installation of new mechanical openings, framing for new escalator and...
full demolition of house
Demo the (e) detached. garage
Eplan. demo (e) single family dwelling and detached garage/laundry room
Perform minor interior partition demolition & construction inconjunction with apt#1d renovation. reconfigure bathroom & kitchen layout. install new lighting. no change to use, egress, occupancy or fir...
Interior renovation to include demolition of existing and construction of new partitions for existing office space. no change in use, egress, or occupancy.
ePlanDemolish existing single family house and attached garage.
Application filing to interior demolish including cleaning and removal of nonbearing partitions at cell, 1st and 2nd floor as per plan. Renovation alteration type 1 job to be filed separately. No chan...
Construction Fence needed for NB and Demolition filed under FD #X01265371-I1
Proposing work to address ecb violation 39134908r and dob violation v101524c24-02744. work to include demolition of interior partitions, new sheetrock, new lighting fixtures, new 3-piece bathroom, new...
Full garage demolition in order to comply with emergency order FEU40304ZT
Demolition and construction as required to combine Coop Apt.1 at basement and cellar with Coop Apt.2 at 1st Floor. Removal of 1 kitchen. No change to Use Egress or Occupancy. No change to C of O requi...
Eplan- demo existing 1-story house and detached garage
Interior demolition for existing restaurant renovation. existing non-bearing partition wall and furniture on 1st. fl. will be demolished. ot job will be filed to dob# m01355119-i1. pl & sp jobs will b...
Interior demoliton of non-load bearing interior partitions, and related fixtures on first floor
full demolition of one story structure, using hand held and mechanical means to assist
Proposed non-mechanical full demolition of existing garage.