Search Building Permits
2,014 permits · Other · CA
**2025 Wildfire Project EO1**Install 8000 ga; imderground water storage, tank to be used as back up water for outdoor sprinkler system.
2025 wildfire rebuild, single-family dwelling with an attached garage, (1)-story. nfpa 13d sprinklers throughout
New retaining walls for site.
****2025 wildfire rebuildeo8 eligible project**** grading - for new sfd over basement and retaining wall and deck
ePlan. (N) Detached Accessory Dwelling Unit per GC 66323(a)(2)
***2025 Eligible Wildfire Project Per Executive Order No. 1*** Site grading for removal and recompaction of proposed single family dwelling w/ attached garage -- 2 of 2 ---
Suppl. permit to 25020-20000-01091 to revise retaining wall detail
2025 wildfire rebuild, single-family dwelling with an attached garage, 2-story. nfpa 13d sprinklers throughout. ineligible
Eplan grading - removal and recompact for sfd and adu
2025 WILDFIRE REBUILD, SINGLE-FAMILY DWELLING WITH AN ATTACHED GARAGE, NFPA 13D SPRINKLERS THROUGHOUT--1 of 2--
Grading recompaction & backfill for (2) retaining walls.
2-STORY DETACHED 2ND DWELLING UNIT PER SB9-TWO UNIT DEVELOPMENT WITH ATTACHED 3-CAR GARAGE, RECREATION ROOM, AND ATTACHED ACCESSORY DWELLING UNIT TO COMPLY WITH GCS 66323(a)(1). NFPA-13R FIRE SPRINKLE...
New four (4) story (type iiia), nineteen (19) unit multi-family apartmentwith one (1) level of subtrranean (type ia) parking garage. toc (tier 3) two (2) extemely low income units. sprinklered per nfp...
Grading r&r for a new duplex and a single family with with an attached adu[3 of 3]
****2025 wildfire rebuildeo8 eligible project**** new (2) 10' high max x 229' in total length retaining wall
2025 WILDFIRE REBUILD, SINGLE-FAMILY DWELLING WITH AN ATTACHED GARAGE, BASEMENT AND TRELLIS PATIO, 2-STORY, 62'-2 3/4"x65'-11 1/". NFPA 13D SPRINKLERS THROUGHOUT. INELIGIBLE
***2025 wildfire rebuild non-eligible project*** grading - excavation for basement
(2) new 3'6" retaining walls.
****2025 wildfire rebuild eo8 eligible project**** temporary shoring for sfd over basement and retaining wall
Eplan***proposed warehouse building