Search Building Permits
3,418 permits · Demolition
City Demolition - Sub Demolition Permit for CF-2020-045287. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: No sidewalk. (1) stucco c/w 1...
City Demolition - Sub Demolition Permit for CF-2025-132056. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: No sidewalk. No stucco. Erosi...
Interior renovations of existing apartment #5B. Work to include non-structural demolition, general construction, and finishes. No change in use, egress, or occupancy.
It is proposed the general demolition and construction for new tenant demising wall, splitting one space into two spaces 105 & 106. no change to use, egress, or occupancy.
Full demolition to a five story building
SUBSEQUENT STRUCTURAL APPLICATION FILED HEREWITH. (Structural work including partial demolition and all new structural support elements as shown on filed plans.)
Full demolition to a five story building
Use of chute at the time of full demolition in conjunction with the demo application
Partial demolition work to include removal of non-structural masonry wall for new thru-wall self-condenser unit installation below window sill. No structural member will be affected by this work.
Full demolition of a 2.5 story frame building
Interior demolition on partial 5th floor including removal of partitions and finishes in the existing office suite as per plans filed herewith only. No change to zoning, use, egress, or occupancy.
Demolish total
Proposed demolition within existing demised tenancy. No changes to existing demising walls
Total Demo of Detached dwelling 400 sqft circa 1959
It is proposed the general demolition and construction for new tenant demising wall, splitting one space into two spaces 105 & 106. no change to use, egress, or occupancy.
Total Demo of SFR 1216 sqft circa 1948
Supplemental to 25019-10000-04238 to change scope of work - demo existing detached garage ONLY
Interior demolition on partial 5th floor including removal of partitions and finishes in the existing office suite as per plans filed herewith only. No change to zoning, use, egress, or occupancy.
Full demolition of a 2.5 story frame building
ePlan. Demolish existing one story retail building with dozer ; pedestrian protection fence required