Sirina Fire Prot Corp
Permits (50)
Installation of new sprinkler heads and associated piping on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy.
Remove existing fire water service point of entry piping and provide new secondary backflow prevention and meter assemblies. Modify local branch cold water piping and sanitary drainage. Provide sprink...
Sprinkler modifications on 6th floor as shown on plans filed herewith. No change in egress, occupancy, or use.
Installation of a temporary air-pressurized standpipe system at the columbia university - berrie medical science expansion as per plans submitted herewith, no change in use, egress or occupancy group.
Installation of temporary sprinkler loop during construction and replacement of existing sprinkler and standpipe system; no change to existing water supply. No change to use, egress, or occupancy.
Install new domestic water, booster pump, hot water heaters, lab waste system, gas service; reroute sanitary piping. Provide new wet/dry/pre-action sprinkler systems and modify existing systems for ba...
Nyu langone medical center - tisch 3 clinical phase 3.1 - modifications to an existing sprinkler sytem as per plans filed herewith. no change in use, egress, or occupancy.
Herewith filing sprinkler modifications for HCC Renovations - 12th Floor Refresh Project. No change in use, egress, or occupancy.
Replacement of fire pump in kind on the cellar, as per plans submitted herewith, no change in use, egress or occupancy group.
Modifications to the existing Plumbing and Sprinkler systems on the 4th floor. No change in occupancy, use or egress.
Nyu langone medical center - tisch 3 clinical phase 3.2 - modifications to an existing sprinkler sytem as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing & sprinkler work as per plans
Modification of an existing sprinkler system on the first floor at apple store as per plnas submitted herewith, no change in use, egress or occupancy group.
Herewith filing for the removal of a single Fire Hose Cabinet (FHC) at the 12th Floor (East Wing), as indicated on the submitted plans. No change in use, egress, or occupancy is proposed.
New Sink/hwh, SP modification
Modifications to the existing sprinkler system on the 1st floor (Property Management Office) as per plans. No change to use, egress or occupancy.
Filing for installation of sprinkler heads and related piping as per plans. Filing for installation of water/sanitary plumbing fixtures and related piping as per plans. No change in use, egress, or oc...
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
F bldg sp ph3: sprinkler modifications to accomodate the sprinkler upgrades at the existinghospital building (f bldg.) as per plans. no change to use, egress or occupancy.
New express care unit: sprinkler installation for fit out