Sirina Fire Prot Corp
Permits (129)
Replacement of fire pump in kind on the cellar, as per plans submitted herewith, no change in use, egress or occupancy group.
Nyu langone medical center - tisch 3 clinical phase 3.1 - modifications to an existing sprinkler sytem as per plans filed herewith. no change in use, egress, or occupancy.
Herewith filing sprinkler modifications for HCC Renovations - 12th Floor Refresh Project. No change in use, egress, or occupancy.
Modifications to the existing Plumbing and Sprinkler systems on the 4th floor. No change in occupancy, use or egress.
Plumbing, sprinkler & standpipe modifications on floors 4, 5 & 6 with in the chny bed tower to accommodate interior alterations as perplans filed herewith only.
Modifications to the existing Plumbing and Sprinkler systems on the 4th floor. No change in occupancy, use or egress.
Replacement of fire pump in kind on the cellar, as per plans submitted herewith, no change in use, egress or occupancy group.
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# X00616474 .
Herewith filing sprinkler modifications for HCC Renovations - 12th Floor Refresh Project. No change in use, egress, or occupancy.
Nyu langone medical center - tisch 3 clinical phase 3.1 - modifications to an existing sprinkler sytem as per plans filed herewith. no change in use, egress, or occupancy.
Nyu langone medical center - tisch 3 clinical phase 3.2 - modifications to an existing sprinkler sytem as per plans filed herewith. no change in use, egress, or occupancy.
Nyu langone medical center - tisch 3 clinical phase 3.2 - modifications to an existing sprinkler sytem as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing & sprinkler work as per plans
Plumbing & sprinkler work as per plans
Modification of an existing sprinkler system on the first floor at apple store as per plnas submitted herewith, no change in use, egress or occupancy group.
Modification of an existing sprinkler system on the first floor at apple store as per plnas submitted herewith, no change in use, egress or occupancy group.
Herewith filing for the removal of a single Fire Hose Cabinet (FHC) at the 12th Floor (East Wing), as indicated on the submitted plans. No change in use, egress, or occupancy is proposed.
Tang Temp Egress. Sprinkler work as per plans.
Tang Temp Egress. Sprinkler work as per plans.
Herewith filing for the removal of a single Fire Hose Cabinet (FHC) at the 12th Floor (East Wing), as indicated on the submitted plans. No change in use, egress, or occupancy is proposed.