Yafe Meod Corp
Permits (144)
Installing a temporary 8'-0 high construction fence around the property.
Installing a temporary 8'-0 high construction fence around the property.
Installing a temporary 8'-0 high construction fence around the property.
Installing a temporary 8'-0 high construction fence around the property.
Install construction fence as per plans
Interior renovation at first & second floor; replace concrete pavers on front porch, install (2)new split units cooling and heating systems on existing one-family house.
Interior renovation at first & second floor; replace concrete pavers on front porch, install (2)new split units cooling and heating systems on existing one-family house.
Install construction fence as per plans
First and second story, rear enlargement to an existing residential building
First and second story, rear enlargement to an existing residential building
Herewith filing for an interior renovation ,3 floor extension at rear yard and bulkhead erection; no change in use, occupancy or egress.
Horizontal rear extension of the existing two-story building with basement. the proposed foundation shall consist of reinforced concrete.
Horizontal rear extension of the existing two-story building with basement. the proposed extension shall utilize cmu and wood structural system.
Horizontal rear extension of the existing two-story building with basement. the proposed foundation shall consist of reinforced concrete.
Herewith filing for an interior renovation ,3 floor extension at rear yard and bulkhead erection; no change in use, occupancy or egress.
Horizontal rear extension of the existing two-story building with basement. the proposed extension shall utilize cmu and wood structural system.
Temporary construction fence application
Temporary construction fence application
Propose a new 2-story 2- family building.
Propose a new 2-story 2- family building.