Other Permits in Los Angeles, California
2,013 other permits filed recently
2,013 permits
New 12' x 18' detached patio cover
attn: Farshad backroom Updated grading plan due to unforeseen existing utilities.
New 37' x 66'-9" irregular shaped 2-story sfd w/ accessory dwelling unit and 2-car garage. nfpa 13d fire sprinklers throughout. all work per engineering.
2025 wildfire rebuild, single-family dwelling (2)-story. nfpa 13d sprinklers throughout eo1
Grading Permit for a proposed 4 story duplex in front and 4 story and 2 story attached ADU in the rear
2025 wildfire rebuild, single-family dwelling with an attached garage, (1)-story. nfpa 13d sprinklers throughout
SITE GRADING IN CONJUNCTION WITH (N) AIRCRAFT HANGAR TO INCLUDE UTILITIES, STORM DRAIN & PAVING --NON HILLSIDE GRADING AREA **ePlan**
To backfill the (e) septic tank with cement slurry.
Supplemental permit to 18030-10000-06451 to revise area of grading
2025 wildfire rebuild, single-family dwelling with an attached garage and basement, 2-story. nfpa 13d sprinklers throughout. eo1basement walls and partial existing foudation to remain
New 2-story building, included 1 SFD + 1 attached ADU building per SB 1211.
**2025 wildfire project** eo1 - removal and recompaction for the sfd.
eplan NEW DETACHED ADU PER GCS 66323(a)(2) WITH COVERED PORCH
eplan. Temporary shoring with lagging and solider piles for retaining wall"COMPLY WITH DEPARTMENT ORDER effective date 02/28/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE".
2025 wildfire rebuild, single-family dwelling with an attached garage and basement, (2)-story. nfpa 13d sprinklers throughout
New 17' 3" x 21' Recreation Room, with bathroom exterior access only to the shower and attached Trellis. NFPA 13D Sprinklers are required.See comments
Supplemental permit to 18020-10000-02770 to update plot plan for revised wall layout; add new retaining wall 16'-6" long, max height of 4'-3 1/2"
New 2-story sb9 with attached two car garage
eplan. Hillside grading of 7.3 cubic yards for new retaining wall"COMPLY WITH DEPARTMENT ORDER effective date 02/28/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE".
Grading permit for construction of a loading dock platform and ramp.