Other Permits in Bronx, New York
2,952 other permits filed recently
2,952 permits
Installation of temporary needle beam as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Herewith filing Mechanical and OT-Lighting for new school building
Installation of a temporary wooden construction fence.
Modification of existing sprinkler system on the 1st floor. no change to use, egress, or occupancy.
Temporary construction fence
Mh work filed in conjunction with dob now gc and pl. no change to use, occupancy or egress.
Installation of temporary construction fence as per drawings. fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application
Furnish and install air-conditioning units, heat pump, fan coil units, energy recovery ventilator etc. as shown on drawings. existing supply and exhaust ductwork to be removed. existing opening shall...
Application filed herewith to convert an existing three story 2 family residential building to an eight family
Installation of Emergency sidewalk shed as per AC -28-105.4.1 per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application...
Herewith filing new school building
Herewith filing foundation application for new school building.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Herewith filing sub-doc civil earthwork for new school building
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Proposed horizontal and vertical enlargement of an existing two-story building to a four-story, 8-family residential building. Obtain a new C/O.
New 8 story mixed use building
Replace the entire existing masonry parapet wall that has partially collapsed with a new metal stud parapet wall.
Installation of eight (8) split systems to supply 8 family dwelling.
It is proposed to file for structural work for proposed new school as shown on plans