Sh/ps92x- for temporary construction equipment(emergency shed) submitting on behalf of contractor, related with llw# 138788 . no change in use, occupancy or egress
Installation of construction fence
Filing for the installation of sidewalk shed on behalf of contractor
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Underpinning along the north side of the property.
Sh/mott haven educational campus - for temporary construction equipment(emergency shed) submitting on behalf of contractor, in conjunction with llw#138540 no change in use, occupancy or egress
Sh/ps4x - for temporary construction equipment (emergency shed) submitting on behalf of contractor, in conjunction with llw#138787 no change in use, occupancy or egress
Relocate and install sprinkler head on the 1st floor #4770, sprinkler works as per plan. no change in egress, use, or occupancy.
Sh/ps105x - for temporary construction equipment(emergency shed) submitting on behalf of contractor, in conjunction with llw#133687 no change in use, occupancy or egress
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy.
Sh/ps92x- for temporary construction equipment(emergency shed) submitting on behalf of contractor, related with llw# 138788 . no change in use, occupancy or egress
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Modifications to the existing wet sprinkler system to accommodate the new architectural background as indicated on the plans filed herewiith. no change in use, egress or occupancy.
Filing Support of excavation plans subsequent to primary job number X01185640-I1
Install retaining wall as per plans, no change in use, egress or occcupancy
Proposed Foundation Plans for a Four (4) Stories Building with Cellar.
Shoring and bracing for new 9 story building
Filing Structural application subsequent to Primary application # X01185640-I1
Temporary placement of a magni rth 5.39s telehandler to hoist and load formwork, rebar, wire mesh, material and concrete trowel machines