Roofing Permits in Bronx, New York
602 roofing permits filed recently
602 permits
Nstallation of a temporary roof protection as per plans during new building construction. no change in use, egress or occupancy. roof protection to comply with 2022 nyc building code, chapter 33.
Installation of solar panels, rooftop, railed,grid-tied, 11 modules, 4.51kw
Installation of solar panels, rooftop, railed, grid-tied, 11 modules, 4.51kw
AT&T - Relocation of existing RRH units on the roof. All work is in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
AT&T - Relocation of existing RRH units on the roof. All work is in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Installation of solar panels, rooftop, railed,grid-tied, 11 modules, 4.51kw
Installation of solar panels, rooftop, railed, grid-tied, 11 modules, 4.51kw
Installation of non-emergency gas fired generator with related gas booster pump on new steel platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Mechanical work (direct replacement of (1)hvac roof top unit).**no change in use, occupancy, or egress is involved under this application**
Interior renovation inside existing retail space @ 1st fl to propose a take-out restaurant (burger spot). work to include refinish floor, new exhaust hood with related duct work and exhaust fan @ roof...
Installation of solar panels, rooftop, grid tied, railed, 16 modules, 6.56 KW
Installation of solar panels, rooftop, railed, grid-tied, 23 modules, 9.43kw
Structural work filed for partial demolition of 2nd floor of existing 2-story building with roof.
installation of solar panels, rooftop, railed, grid-tied, 5 modules, 2.05 KW
Installation of solar panels, rooftop, railed, grid-tied, 23 modules, 9.43kw
installation of solar panels, rooftop, railed, grid-tied, 5 modules, 2.05 KW
Installation of solar panels, rooftop, grid tied, railed, 16 modules, 6.56 KW
Interior renovation inside existing retail space @ 1st fl to propose a take-out restaurant (burger spot). work to include refinish floor, new exhaust hood with related duct work and exhaust fan @ roof...
Structural work filed for partial demolition of 2nd floor of existing 2-story building with roof.