Modification to Verizon site. Relocate 2 GPS antennas and 1 antenna. Replace 1 antenna, remove 1 antenna, replace 2 RRHs, remove 2 RRHs, install 4 RRHs, install 6 antennas, remove 1 cabinet, install n...
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Suspended scaffold outrigger system for exterior inspection
Structural in conjunction with I1 construction filing to include sister basement joints, new footings and columns, new cellar slab, new cellar entrance as per the plans filed herewith
Installation of construction fence as shown on drawings - to comply with chapter 33 of 2022 b.c
Proposed restoration of existing Curb Cut #2, as per plans.
Sprinkler specifications filed in conjunction with gc application b01061260-i1
Proposed installation of steel lintels for new garage door opening, extension of parapets on both street frontages. No change to use, occupancy or egress under this application.
Convert 4 family residence into a single family residence. horizontal and vertical enlargement. - existing two story brick and wood joists to remain & be repai
Install sprinkler system at 1st floor restaurant of existing 1-story building as per plans filed herewith.
File application to install 8' height temporary construction fence for alt-co job #b01188515-i1 . no change to use or egress.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of suspended scaffold for facade work or inspection.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Installation of a temporary supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with th...
SOE work
Subsequent structural application in conjunction with approved gc #b01345861-i1
Installation of suspended scaffold for facade work or inspection.