Other Permits in Brooklyn, New York
6,989 other permits filed recently
6,989 permits
Filing Foundation application subsequent to the primary application B00997529-I1
mechanical work in apt 6B
Proposed mechanical equipment throughout building
Structural specifications filed in conjunction with gc application job #b01239985-i1
Install four(4) new heat pumps.
Mechanical specifications filed in conjunction with alt # b01199644-i1
Minor partition work with with general carpentry in apt 3. No Change to use, bulk or egress
THIS APPLICATION IS BEING FILED FOR GENERAL CONSTRUCTION & STRUCTURAL WORK AT SECOND FLOOR TO REPLACE STUCCO, REPLACE 15 SF OF DAMAGED FACE BRICK AT FRONT FACADE & REPLACE METAL COPING. No change in U...
Installation and provisions of systems, equipment and services for a pre-k center, including electric cabinet unit heaters, perimeter electric wall pressed convectors,split system air-cooled heat reco...
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of temporary construction fence to be removed only after all physical work has been completed.
Ms application hereby filed in conjuction to job #b01233556
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed 8ft construction fence. no change to use, egress or occupancy under this application.
Structural application filed to rebuild the exposure 3 exterior wall with cmu. no change in egress, use or occupancy under this application.
Installation of 8ft construction Fence.
Provide steel reinforcing for new louver opening on non-load-bearing masonry wall or foundation wall. Provide interior concrete pad for MEP equipment. Provide outdoor flue and cladding frame support.
Installing temporary construction fence as per plan, conjunction with job #b01152515-i1. no change in use, egress or occupancy.