Other Permits in Brooklyn, New York
7,084 other permits filed recently
7,084 permits
Fence work in conjunction with early foundation work.
Temporary plywood construction fence. filed in conjunction with proposed charging station submitted under separate application # b00582586.
Proposed structural work type for a 4 story mixed-use building with penthouse and cellar, inconjunction with alt-co application 321387931
App to reconfigure the interior of the exist. occupancies, while maintaining use of 2 fam. based on cofo(226285 - 06/28,1986).the building will continue to function as a 2 family property. there will...
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary construction fence at 813 sterling place, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Remove all existing trees and existing improvements (e.g. pavement, fencing, etc.) as indicated on drawings. install soil erosion and sediment control measures.
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2014 nyc building code.
Proposing a new curb cut for (1) one parking spot. in conjunction with job #321591078
Installation of sidewalk shed as per plans. shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
NYCHA-Sumner Bldg #13 Mechanical Work filed for Replacement of existing vacuum pump & connections, control valve & by-pass valve system. Removal of steam piping to existing DHWH. Install of temp. cond...
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2014 nyc building code.
Installation of 8ft Construction fence.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Construction of wooen fence as per plans filed herewith. no change in use, egress and occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.