Other Permits in Brooklyn, New York
7,048 other permits filed recently
7,048 permits
Mechanical work as shown on plans.
Installation of supported pipe scaffold as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Lehalizing partitions in the Basement.
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Subsequent foundation and earthwork application filed herewith.
Proposed to restore existing building damaged due to fire as per plans herewith submitted. Removing and replacing non-bearing partitions, finishes, floor joist and windows damaged by the fire. No chan...
Tenant fit-out for Jersey Mike's Subs at this location. No change in use, egress, or occupancy under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Mechanical specifications filed in conjunction with gc application b01297622-i1
Installation of sprinkler heads under a temporary construction scaffolding as per the filed plans. No change to use, occupancy or egress.
Foundation/Earthwork filed in conjunction to application #B01186327
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
Installation of 300psf heavy duty sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Resolve 39172975y and 39172976x; remove (3)illegal shed storage at rear yard and restore back to prior legal rear yard. no change in use, egress or occupancy under this application.
Subsequent filing for Sprinkler work
OT: Remove doors, walls, partitions, flooring, finishes, ceilings, and provide new. Provide small building addition to create new entry to building. No change in use, occupancy, or egress.
Install Temp system, piping and accessories, demo of piping, team control valve, steam traps, piping and insulation new equipment and accessories condensate return/feedwater, flush and lean radiators,...
Erect fence.
proposed construction fence