Other Permits in Brooklyn, New York
7,047 other permits filed recently
7,047 permits
Resolve 39172975y and 39172976x; remove (3)illegal shed storage at rear yard and restore back to prior legal rear yard. no change in use, egress or occupancy under this application.
Subsequent support of excavation application in conjunction with gc # b01043157-i1
Mechanical specifications filed in conjunction with gc application b01333932-i1
Install Temp system, piping and accessories, demo of piping, team control valve, steam traps, piping and insulation new equipment and accessories condensate return/feedwater, flush and lean radiators,...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Modification to Mechanical systems as per plans filed herewith.
Subsequent filing for Sprinkler work
Establish a bakery with a take-out restaurant
Tenant fit-out for Jersey Mike's Subs at this location. No change in use, egress, or occupancy under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Herewith filing for construction of new four story, four family, multiple dwelling
Structural work in conjunction with the vertical enlargement filed under #b01092146-i1
Separation of apartments combined under DOB Job No. 320410845. Work to General Construction to close partition opening for and the reinstallation of a kitchen in apartment 3C in the previous location....
Propose to remove interior partitions and install new split system at 1st floor as per plan. No change in use, egress, or bulk.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Subsequent foundation and earthwork application filed herewith.
Application filed to horizontally enlarge and renovate the existing 3-story + cellar synagogue and dormitory.
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.