Other Permits in Brooklyn, New York
7,047 other permits filed recently
7,047 permits
Remove and replace wall mounted Air condensing units in basement and first floor.
P.S. 44-K: Mechanical Work including exhaust for modified toilets, Split AC for Proposed Elevator Machine Room.
K104_Replace concrete slab at courtyard areaway.
K104_Replace concrete slab at courtyard areaway.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
P.s. 004-k: structural work type for a new 4-story school building.
Filling for installation of engineered enclosure system per 3309.17
P.s. 004k: proposed a new 4-story school building.
Support of excavation for conversion to 2 family home.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
K012: Replacement of Exhaust fans and Split System Heat Pump Ductless Unit and associated duct work.
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Ground floor ramp, stair, and entry door ADA upgrades. 2nd floor Cafeteria upgrades, new furniture and finishes, new drinking fountains.
Installation of sidewalk shed for public protection during cinstruction work
INSTALLATION OF NEW 8FT HIGH ALUMINUM FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
SITE YARD WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
INSTALLATION OF NEW 8FT HIGH ALUMINUM FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.