Other Permits in Brooklyn, New York
7,084 other permits filed recently
7,084 permits
Replace existing fence with new fence in existing side and rear yards. no change to use, occupancy, or egress.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
New 2 family 4 story with cellar building
Replacement of existing chillers with new air-cooled modular chillers. Replacement of three existing air-conditioning units in kind with portion of associated ductwork. BMS system installation for the...
Installation and use of temporary overhead protection as per plans filed herewith. no change to use, egress or occupancy under this application.
Installation of temporary construction plywood fence as per plans during construction. no change in use, egress or occupancy. fence shall comply with chapter 33 of nyc building code of 2022.
Sprinkler work in conjunction with tenant-fit out - south office suite. alt 1 321385504
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Proposed general construction and addition of storm drainage system at existing ev charging station filed under application # b00582586. no change in use, egress or occupancy.
ms
Install construction fence as per plans
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of construction fence for public protection during construction work.
Structural work horizontal and vertical extension, reinforce existing wood joists in conjunction withalt-1 job #b01320238-i1
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Here to file construction work of proposed eating and drinking establishment at cellar to install new partition and door as per plan. file to address ecb 39136068m, 39136069y. no change to use, egress...
Installation of mechanical equipment as per plans. no change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.