Plumbing Permits in Brooklyn, New York
2,509 plumbing permits filed recently
2,509 permits
Subsequent plumbing application in conjunction with approved gc #b01088716-i1
Proposed plumbing scope of works for moderate renovation of existing 4-story + cellar new tenement building in conjunction with alt-co-gc application # b00622757-i1. no change in use, egress & occupan...
Application filed for plumbing work in conjuction with newly combined apartment 1cd and 1e. all construction work filed under separate application.
Installation of plumbing and sprinkler systems for multi-family residential building in conjunction with b00780032-i1
Plumbing work associated as shown on plans.
Plumbing and gas piping work on all floors in conjunction with renovation.
New plumbing and gas from cellar to 3rd floor.
Plumbing plans filed in conjunction with nyc dob alt 1 application #: 320515313
Interior renovations of units 4k, 5c, 5h and 6b on the 4th, 5th, and 6th floors. work includes new non-structural interior partitions, replacement of plumbing fixtures, and interior finishes.
1 new water closet, 1 new lav.
File plumbing work type in conjunction with gc application b01279573-i1.
Interior renovations of units 2k and 3k on the second and third floors. work includes new non-structural interior partitions, replacement of existing plumbing fixtures, and interior finishes.
Subsequent filing for plumbing work type for the second and third floor interior renovation of the existing three-story building. no change in use, egress or occupancy.
Subsequent plumbing application in conjunction with approved gc #b01088716-i1
Plumbing work in conjunction with alteration
Application filed for plumbing work in conjuction with newly combined apartment 1cd and 1e. all construction work filed under separate application.
installation of new plumbing fixtures
Plumbing work associated as shown on plans.
Stormwater drainage work is adding additional catch basins within the property limits to prevent future flooding. and does not increase the impervious area and all stormwater structures are connecting...
New plumbing and gas from cellar to 3rd floor.