Plumbing Permits in Brooklyn, New York
2,526 plumbing permits filed recently
2,526 permits
File plumbing permit- cellar space in accordance with approved sd1+2 (sck-1110.24) required by the dob plumbing chief.
Shp2 - filing for civil site work plumbing components in conjuction with new building b00848002-i1
Plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.
New plumbing fixtures cellar, 1st fl, 2nd fl, 3rd fl. open space
Plumbing work application filed in conjunction with GC application B01309759-I1 as per plans.
plumbing work at basement indicated on drawings filed herewith No change in Use Egress or Occupancy under this application
File plumbing work at existing 3-story residential building to remove gas fixtures, plumbing fixtures, install new plumbing fixtures and gas appliances as per plan. no change in use, egress or occupan...
Hand-demolition - interior alteration, remove and replace all interior finishes and fixturesincluding, but not limited to the following: plumbing fixtures, appliances, cabinets, doors, door frames, an...
Proposed interior renovations of existing 3-family building to repair fire damage. plumbing work to be filed subsequently.
relocate 1 washer, 1 dw, 1 sink, 1 wc, 1 lav, 2 new showers, 1 new wc, 1 new lav
Interior Renovation of Unit B60. Plumbing work to be done. No change of use, egress or occupancy under this application.
Plumbing, Sprinkler and Standpipe drawings filed in conjunction with NB application B01186301-I1
Propose to legalize 3 piece bathroom in the cellar and cap existing stove
Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Modifications to plumbing fixtures and related piping as shown on drawings. No change to occupancy use or egress.
new plumbing and sprinkler installation in conjunction with B01142222-I1 (new building)
Proposed Plumbing work in conjunction with General Construction Alteration DOB# B01196536-I1 for the renovation of apartment 4B on the 4th Floor. No Change in use, egress, bulk or occupancy under this...
Plumbing application -cap and remove plumbing fixtures and replacement of kitchen sinks. filing for the installation of new plumbing fixtures at all floors. filing for removal and replacement of waste...
Proposed demolition and installation of new plumbing fixtures throughout the first(1) and second (2) floor. No change to use, occupancy or egress under this application.
Relocating ex. kitchen sink. relocating ex. lav, & exist bathtub on the existing bathroom. proposed an additional bathroom with, 1 lav, 1 toilet and 1 bathtub. proposed a new dishwasher at kitchen.no...