Renovation Permits in Brooklyn, New York
2,081 renovation permits filed recently
2,081 permits
Propose renovation at CEL & 1st floor of existing residential building with partition work and finish work as per plan. No change in use, egress, or occupancy.
Proposed interior renovation as per plans. no change to use, egress or occupancy under this application.
Proposed interior renovation and replace windows
Interior renovation in existing 4-family 2-sty, residential building with cellar. no change in use, means of egress or occupancy in this application.
Proposed interior renovation converting existing 3 story and cellar into a 10 unit residential building.
Facade repairs, scaffold inspections, three men letter
Minor interior renovation of apartment 18f. relocate non-structuralpartitions and replace fixtures and finishes throughout. no change to use, egress or occupancy.
Steel repairs required as part of facade repairs.
Facade repairs, scaffold inspections, three men letter
Filing for interior renovation repairs of fire damage building. no change in use egress or occupancy.
This application is filed to repair the ex 3 family residential building due to fire and smoke damage, no change of use, egress or occupancy
Interior and exterior renovation of existing 2-story building as shown on plans. No change to use or occupancy.
Proposed alteration to existing (3) three story dwelling to alter to a five (5) story, five (5) family dwelling with existing foundations to remain as per plans filed herewith
Facade repair at exposure 1. filing for approx 175 sf of brownstone repair, installation of10 window guards, installation of light fixtures. remove and replace entry door at same location and replacem...
Proposed alteration to existing one (1) story commercial building to 5 story mixed use building as per plans filed herewith
facade repairs, scaffold inspections, three men letter
Installation of suspended scaffold for emergency facade repairs and facade inspection. suspended scaffold shall comply with chapter 33 of the 2022 nyc bc. no change in use, egress or occupancy under t...
interior renovation
interior renovation of existing floor. no change to use,egress nor occupancy
Work shall include direct replacement of finishes direct replacement of apartment kitchen, bathrooms, doors and window sashes. additional ground level hardscape repairs and improvements as needed per...