Renovation Permits in Brooklyn, New York
2,108 renovation permits filed recently
2,108 permits
Bmh main campus: facade repair, including brick repointing, lintel repair and window replacement as per plans filed herewith. no change to zoning, use, egress, or occupancy.
Renovation of existing cellar, 1st, 2nd floor and attic with general construction: new partitions, doors, flooring and cosmetic work; no change in use, egress or occupancy under this application.
Mechanical systems alteration. Ductless split system heat pumps no change in use, egress or occupancy.
Application to reconfigure Unit 11B and 11C on 11th floor, interior renovation in Unit 11C. Partition work as per plan. No change in use, occupancy or exit.
Install beta-max hoist. beta-max hoist to lift material for exterior facade repairs. sidewalk shed filed under separate application.
Proposed interior renovation at cellar & 2nd floor only. no change of use, bulk, egress, and occupancy.
This Alteration application is being filed for the installation of 3 fire service for the existing 2 story mixed commercial & residential building. There are no change to use, egress or occupancy.
Structural repairs including new steel posts and beams to support the existing floor joists, masonry crack repairs, and new tie-backs for the front facade to the floors as per plan, filed in conjuncti...
renovation of existing coffee shop to make bathroom accisble and change bar layout
General renovation on 3rd fl(apt. 3r) of mixed use building with, repair/replace partition, ceiling, floor, window, painting as per plan. no change in use, egress or occupancy.
Renovation of existing cellar, 1st and 2nd floor with general construction: new partitions, doors, flooring and cosmetic work; replace stair at rear yard. no change in use, egress or occupancy under t...
Exterior Facade Repair
Interior renovation work on the cellar floor, remove shower and sink, ierect new interior walls, provide new steel lintels over masonry openings all on the cellar floor. application also filed to addr...
Parapet wall repair at exp 1. no change in use, egress or occupancy under this filing.
Blank Street Coffee - General construction inclusive of partitions, modifications for cafe remodel. No change to use, egress, or occupancy.
An existing 1 story commercial building with interior renovation at a store front.no change in use, egress or occupancy.
Addition at all floors. Interior renovation
Structural repairs including new steel posts and beams to support the existing floor joists, masonry crack repairs, and new tie-backs for the front facade to the floors as per plan, filed in conjuncti...
Renovation of existing cellar, 1st and 2nd floor with general construction: new partitions, doors, flooring and cosmetic work; replace stair at rear yard. no change in use, egress or occupancy under t...
General renovation of restore collapse garage to remove ecb violation# 39157111l, 39157112n, 39157113p. no change in use, egress and occupancy.