Roofing Permits in Brooklyn, New York
1,386 roofing permits filed recently
1,386 permits
modify existing ductworks, replace existing indoor VRF fan coil units to connect with existing rooftop VRF Heap Pump units.
Roof & parapet replacement.exterior masonry repairs including face brick replacement,repointing, lintel replacement. new stairs & concrete work.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Rooftop solar installation. no change to use, occupancy or egress.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Facade repair including EIFS replacement, roof replacement, railing, brick and door replacement as per plans filed. No change in use, egress or occupancy.
Replacement of existing HVAC units on Bob's Discount Furniture roof in existing location, including minor plumbing work. No change to use, egress or occupancy.
modify existing ductworks, replace existing indoor VRF fan coil units to connect with existing rooftop VRF Heap Pump units.
Installation of 59.84 kw solar energy system on roof. No change of occupancy, use or egress.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of solar panels, rooftop, grid tied, railed, 10 modules, 4.1 KW
Installation of multizone heat pump system with condensing units on the roof and associated air handlers, ductworks and grilles as per plans. no change in use, egress and occupancy.
Facade repairs include EIFS replacement, brick, railing, roof and door replacement as per plans filed. No change in use, egress or occupancy.
Mechanical work on basement,1st, 2nd, 3rd floor & roof. no change in egress, use or occupancy.
Mod. to Verizon site. Remove 4 RRHs & an equipment cabinet/ancillary equipment on penthouse. Replace 6 antennas, install 3 antennas, 9 RRHs, 3 distribution boxes & equipment platform with equip. cabin...
installation of solar panels, rooftop, railed, grid-tied, 20 modules, 8.2 kw
Installation of photovoltaic solar array on existing roof system as per plans
Installation of photovoltaic solar array on existing roof system as per plans
Installation of temporary roof protection as per plans. no change in use, egress or occupancy. shall comply with chapter#33 of 2022 nyc building code.
Installation of photovoltaic solar array on existing roof system as per plans