Roofing Permits in Brooklyn, New York
1,381 roofing permits filed recently
1,381 permits
General construction for existing roof membrane & insulation replacement at main & bulkhead roofs as per plans filed herewith. no change in use, egress or occupancy.
Sound and repair damaged stucco, repoint brick, repair cracks, replace lintels, repair Sidewalk, remove vegetation from side of walls, replace railing at roof as per plans filed herewith. No change to...
Renovation of 3-story nycha multiple dwelling as part of the nycha pact renovation: provide roof dunnage for mep equipments; no changes to use, egress or occupancy.
Application filed herewith to install new bathroom & kitchen roof mounted exhaust ventilators w/ new CAR fire rated damper. Vacuum clean all existing duct work. Change existing shut off and air valve.
General construction consisting of roof and window replacement, insulation at exterior walls along with interior renovations as per plans filed herewith. No change to use, egress or occupancy
General construction consisting of roof and window replacement, insulation at exterior walls along with interior renovations as per plans filed herewith. No change to use, egress or occupancy
Mechanical modifications on 6th floor and roof as shown on plans filed herewith. No change in egress occupancy or use.
Application filed herewith to do minor apt. partition work in apt. line c only. install new plumbing fixtures. replace windows. repair terra-cotta veneer facade. new re-roofing. no change in use, occu...
Minor apt. partition work. repair existing plumbing system. install new plumbing fixtures & kitchen cabinets. replace window steel lintels & windows. rebuild parapet walls & repair masonry facades. ne...
Application filed to install new bathroom ceiling mtd. exhaust fan w/ new car fire rated damper& new roof mtd. relieve hood. vacuum clean all exist. duct work. install new roof gravity vents. change e...
General construction consisting of roof and window replacement, insulation at exterior walls along with interior renovations as per plans filed herewith. No change to use, egress or occupancy
Installation of 74.36 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of solar panels, rooftop, railed, grid-tied, 18 modules, 7.38kw
Use of gas material hoist during roof replacement
Installation of 104.72 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of steel dunnage for installation of new heat pump unit at the main roof as per plans filed herewith. No change to use, egress, or occupancy.
Filing application to install kitchen hood, exhaust duct and fan on first floor to roof as per plan.
Decommission of existing tmo site. remove equipment platform and dunnage, 9 antennas, 6 rrh and 1 gps from roof. remove cables from basement facade and roof. no change in use, egress or occupancy. ori...
Gas material hoist during roof replacement
Minor apt. partition work. repair existing plumbing system. install new plumbing fixtures &kitchen cabinets. replace window steel lintels & windows. rebuild parapet walls & repair masonry facades. new...