Roofing Permits in Brooklyn, New York
1,381 roofing permits filed recently
1,381 permits
Interior & exterior work to include facade restoration, demo & install of partitions, window & door replacements, roof replacement, new skylight, new stair in rear, replacing existing roof access hatc...
Asbestos removal on Roof level and replacement of roof
K263-replacement of roof, select exterior doors & windows & window guards. new roof access ladder. rebuilding of parapet walls. masonry repairs & repair of interior finishes.
Rooftop solar installation. no change to use, occupancy or egress.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Filing herewith plans and applications for new 3 story rear extension and interior renovations cell, bas, 001, 002, 003. roof. plumbing filed under b01257611-s1. no change in use, egress, or occupancy...
Gc & structural work for garage repairs including concrete slab repairs, steel reinforcement, and installation of fireproofing on steel framing as per plans filed herewith. no change in use, egress or...
Proposed mechanical work on cellar, 1st to 4th floor & roof. in conjunction with dob now alt-co job no: b01044374-i1 as per plan. no change in use, egress or occupancy.
K033 ext masonry, parapets & roof work.
Temporary roof / overhead protection as per drawings. roof / overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Proposed mechanical work on cellar, 1st to 4th floor & roof. in conjunction with dob now alt-co job no: b01044374-i1 as per plan. no change in use, egress or occupancy.
Asbestos removal on Roof level and replacement of roof
Filing herewith plans and applications for new 3 story rear extension and interior renovations cell, bas, 001, 002, 003. roof. plumbing filed under b01257611-s1. no change in use, egress, or occupancy...
Gc & structural work for garage repairs including concrete slab repairs, steel reinforcement, and installation of fireproofing on steel framing as per plans filed herewith. no change in use, egress or...
K263-replacement of roof, select exterior doors & windows & window guards. new roof access ladder. rebuilding of parapet walls. masonry repairs & repair of interior finishes.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Temporary roof / overhead protection as per drawings. roof / overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Interior & exterior work to include facade restoration, demo & install of partitions, window & door replacements, roof replacement, new skylight, new stair in rear, replacing existing roof access hatc...
Rooftop solar installation. no change to use, occupancy or egress.