Roofing Permits in Brooklyn, New York
1,381 roofing permits filed recently
1,381 permits
Ctf - interior renovation & upgrades to exist. construction trade shops (elect rm. in cel floor & rooms 101 & 125). install split system ac unit & related equip support on roof for mechnical unit. no...
Herewith file to extend existing boiler chimney on roof as shown. no change in use, egress, and occupancy
Outriggers system installation and material hoist for roof and facade repairs, no change in use, egress, or occupancy.
Proposed installation of new elevated first (1) floor slab exterior platform and exterior stairs and rooftop dunnage. No change to use, occupancy or egress under this application.
Relocation of existing DAIKIN ACCU unit. Extension of all vent pipes, new insulation on all refrigerant piping, cleaning & restoration of smoke vents, cleaning & painting of post indicator valves. Ret...
Outriggers system installation and material hoist for roof and facade repairs, no change in use, egress, or occupancy.
Existing 3 stories and cellar (3) three family dwelling units ,to be fully renovated, new drywalls partitions and plumbing fixtures. new rear metal passage to yard and metal stairs, and new stair bulk...
Installation of new non-emergency gas generator on the roof. No change in use, egress or occupancy.
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
Partial Demo of Existing Roof and Portion of Wall
Proposed work to include Exterior Masonry, Roofs, Parapets, Windows.
Installation of a temporary roof protection as per plans during general construction. no change in use, egress or occupancy. roof protection to comply with 2022 nyc building code, chapter 33.
Ctf - interior renovation & upgrades to exist. construction trade shops (elect rm. in cel floor & rooms 101 & 125). install split system ac unit & related equip support on roof for mechnical unit. no...
Installation of new non-emergency gas generator on the roof. No change in use, egress or occupancy.
Installation of a temporary roof protection as per plans during general construction. no change in use, egress or occupancy. roof protection to comply with 2022 nyc building code, chapter 33.
Proposed installation of new elevated first (1) floor slab exterior platform and exterior stairs and rooftop dunnage. No change to use, occupancy or egress under this application.
Partial Demo of Existing Roof and Portion of Wall
Outriggers system installation and material hoist for roof and facade repairs, no change in use, egress, or occupancy.
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
Existing 3 stories and cellar (3) three family dwelling units ,to be fully renovated, new drywalls partitions and plumbing fixtures. new rear metal passage to yard and metal stairs, and new stair bulk...