Roofing Permits in Brooklyn, New York
1,391 roofing permits filed recently
1,391 permits
Plumbing work for the renovation of the cellar, basement, 001 - 003 floors and roof. no change to use, egress, or occupancy.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Proposed renovation of existing apartment with new partitions & finishes; removed abandoned vent on roof and seal up. no change in use, egress and occupancy.
Rooftop solar installation. no change to use, occupancy or egress.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Remove and replace existing Roofing systems and masonry repairs .
Renovate apt units #s2 & #a3 on 3rd & 4th floor and common hallway from cellar to roof, including removal & installation new interior partitions, lighting, mechanical, plumbing & finish. no change to...
Garage and roof repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Exterior facade repairs and waterproofing. No change in use, egress or occupancy. Sidewalk shed filed under separate application
Repairs to facade and subgrade waterproofing, replacement of scuppers, replacement of exterior pads and stoop.
PROPOSED MECHANICAL WORK FOR A SINGLE FAMILY BUILDING. WORK AT CELLAR, BASEMENT, 1st FLOOR TO 4th FLOOR & ROOFTOP. AS PER PLAN. IN CONJUNCTION WITH DOB NOW GC JOB#: B01278030-I1.
Fire damage areas repairs, new finishes, framing repairs, roofing as per plans
Installation of photovoltaic solar array on existing roof system as per plans.
Localized masonry rebuilding and expansion joint replacement, and associated waterproofing, sealant.- replacement of roofs including new counterflashing, scuppers, and coping repairs. no change to use...
Reinstallation of rooftop exhaust fans and devices in conjunction with roof repairs. no change to use, egress, or occupancy.
Mechanical systems alterations on the 1st thru 3rd floors, cellar, mezzanine, and roof levels in conjunction with proposed full building renovation; related work as per plans.
Installation of solar panels, rooftop, grid tied, railed, 17 modules, 6.97 KW
Direct replace rtu-1 on roof for first floor social security office
Installation of hvac roof top units. no change in building use, occupancy and egress.
Installation of hvac roof top units as per plans herewith. no change in building use, occupancy and egress.