Roofing Permits in Brooklyn, New York
1,391 roofing permits filed recently
1,391 permits
Installation of solar panels, rooftop, grid tied, railed, 17 modules, 6.97 KW
Mechanical systems alterations on the 1st thru 3rd floors, cellar, mezzanine, and roof levels in conjunction with proposed full building renovation; related work as per plans.
Replace condenser unit at roof as shown on plans filed herewith.
Replace condenser unit at roof as shown on plans filed herewith.
New rooftop HVAC unit for service of addition and modification of existing systems in areas at point of connection to addition and also impacted by accessibility scope of work
Rooftop solar installation. no change to use, occupancy or egress.
Structural work for ALT-CO application on floor CEL, 001-005, bulkhead and roof.
Installation of rooftop HVAC equipment, kitchen exhaust ducts and fans, associated with new supermarket on ground floor. No change in egress, use or occupancy
Application filed herewith for proposed interior renovation, roof, facade, & windows replacement of existing 2 family w/cellar building. no change in use, egress or occupancy
Replace a heating & cooling commercial packaged unit at 1st floor roof. no change in use, occupancy and means of egress
installation of solar panels, rooftop, railed, grid-tied, 10 modules, 4.1 KW
Rooftop solar installation. no change to use, occupancy or egress.
Structural modifications as per plans filed herewith (Miscellaneous steel support for moveable partition wall at 1st floor, construction of a masonry elevator bulkhead above the existing roof level, r...
Proposed interior alterations including rear expansion and rooftop addition.
Roof replacement work related to PS 23.
Installation of pv system on existing rooftop. no changes to egress or use of occupancy.
Rooftop solar installation. no change to use, occupancy or egress.
Installation of pv system on existing rooftop. no changes to egress or use of occupancy.
Application filed herewith for proposed interior renovation, roof, facade, & windows replacement of existing 2 family w/cellar building. no change in use, egress or occupancy
Structural modifications as per plans filed herewith (Miscellaneous steel support for moveable partition wall at 1st floor, construction of a masonry elevator bulkhead above the existing roof level, r...