Roofing Permits in Brooklyn, New York
1,387 roofing permits filed recently
1,387 permits
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Structural modifications & new rooftop steel dunnage as per the drawings filed herein.
Structural work filed in conjunction with the renovation of one family residence. Framing for enlarged opening at rear wall, for roof skylight and hatch. Roof dunnage.
Nyu langone - brooklyn augustana 3rd floor rehab - structural modifications including new dunnage to allow for new mechanical equipment on roof. no changes in use, egress, or occupancy.
Nyu langone - brooklyn augustana 3rd fl rehab - modifications to existing floors, partitions, ceiling and doors as per plans. scope includes modifications to allow for new connections to equipment on...
Renovation of the garage, including roof replacement, siding replacement, newskylights, new window and door- no change in occupancy, use or egress
Masonry Repair and Roof Repair. No change of use, egress, or occupancy under this application.
Direct replacement of (2) rooftop hvac single package units onto existing roof curbs.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Rebuild the existing fire, smoke & water damaged two family house, work will include new kitchens & bathrooms at existing roughing, restoration/repair of walls, ceiling and floor finishes at cellar th...
Hs 804-k: removal and reinstallation of roof top hvac equipment, removal and replacement of 2 exhaust fans, split system and provide temporary ac equipment.
Repairing the spall and deteriorated concrete and fireproofing.
Facade repairs to include brick masonry repairs & replacement, lintel repairs & replacement, & main roof and bulkhead roof replacement. no change to use, occupancy oregress.
Emergency temporary shoring installation at the parking garage cellar level to mitigate hazardous roof slab conditions and safeguard public. no change in use, egress or occupancy.
Proposed interior renovation and exterior work on exist 3 story building with cellar. work includes removing/installing paritions, finishes, windows, doors, new roof membrane and facade repair. no cha...
Filing obtain a C of O to reflect school. The work proposed is a gut renovation of the existing building cellar through the roof as per the plans submitted.
Emergency temporary shoring installation at the parking garage cellar level to mitigate hazardous roof slab conditions and safeguard public. no change in use, egress or occupancy.
Rebuild the existing fire, smoke & water damaged two family house, work will include new kitchens & bathrooms at existing roughing, restoration/repair of walls, ceiling and floor finishes at cellar th...
Repairing the spall and deteriorated concrete and fireproofing.