Pennsylvania Building Permits
11,211 recent building permits filed in Pennsylvania.
11,211 permits
Alterations - Replacing ct and fai
Addition and/or Alterations - FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS TO...
New Construction or Additions - Plumbing Permit for combo SP-2025-001510
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...
Alterations - REPLACE 10 FIXTURES: 4 toilets, 3 hot water heaters and 3 kitchen sinks without piping, fixtures only. *WITHOUT PIPING*
Change of Use - Assembly and Entertainment
Alterations - REPLACE 3/4" K COPPER WATER LINE
Addition and/or Alteration - Total rewire as per NEC, 200 Amp service with 3 meters
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations...
Addition and/or Alteration - Install 100 amp service, replace outlets switches and lights, install outlet in dinning room and bedrooms All Wire Are Fished
Make Safe Permit For RP - MAKE SAFE PERMIT TO COMPLY WITH UNSAFE VIOLATION CF-2024-052393 TO INCLUDE STRUCTURAL REPAIRS TO FLOOR/ROOF FRAMING PER APPROVED PLANS, ENGINEERS REPORT AND IN ACCORDANCE WIT...
Addition and/or Alteration - FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE AT SUITE 106 & 108 ON GROUND FLOOR. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVID...
Alterations - Excavate on curb stop to clear out debris to endure valve functions. Repair/replace if necessary.
Alterations - REPLACE 3/4' WATER LINE
Addition and/or Alteration - REWIRE HOUSE THROUGHOUT AND INSTALL LIGHTING, SWITCHES AND RECEPTACLE OUTLETS. INSTALL 120 VOLTS INTERCONNECTED SMOKE AND CO ALARMS ALL WORK TO BE DONE ACCORDING TO THE 20...
Addition and/or Alteration - FOR CHANGE OF OCCUPANCY AT 17TH-27TH FLOORS TO R-2 OCCUPANCY AND LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEP...
Alterations - Alterations of existing building drain, building trap, and fresh air inlet (FAI).
Parking Only - For the addition of a parking space at the rear of an existing structure. size and location as shown on the plan.
Addition and/or Alteration - Install visual and audible fire alarm devices to the fire alarm system. All work to be done according to the 2017 NEC the 2016 NFPA 72 and per approved plans.
Addition and/or Alteration - Replace 200 AMP service and panel Replace outlets, switches and fixtures Install dedicated lines using wire mold (fishing wires) Replace basement light fixtures Replace ex...