Renovation Permits in Austin, Texas
401 renovation permits filed recently
401 permits
Change of Use from Office to Restaurant General.
1-story addition/interior remodel to existing single family residence. Adding 1 bed/1 bath (total: 3 bed/2 bath) Primary bath and bed addition with the rest of the existing home to be reconfigured
Convert garage into an office. Add a bathroom
Interior Remodel- general demo [of interior material to be replaced]; minor framing repairs replace drywall finish carpentry paint flooring replacement.
Express- Interior nonstructural demo for exploratory work on upcoming remodel
Exterior structural repair to landing at Bldg 7.
structural repairs to balconies adding weep screens to stucco soffits and remove and replace 40¿x48¿ of front stone facade.
ePlan Review: Addition and finish out of existing admin shell building. Scope includes interior fit out addition for equipment yard 9 transformer pads in fenced area and 6 EV chargers for Building D
Covered porch enclosure of SFR
Generator Replacement - the generator is getting larger to wire back up the entire assisted living care facility (Exterior only for SF)
Tenant Finish Out for Dental Office - Suite 200 2025 122748 DA - Pending
Loading Dock Rework 2580 sq ft and Covered Holding Area 696 sq - 1st Floor
Finish Out for Ground Floor - Building Services Staff Areas Decontam/Clean Assembly Areas Generator Service Courtyard
Finish Out for 3rd Floor 27457 SF - remodel to connect to existing hospital 388 SF
Finish Out for 1st Floor 32571 SF - remodel to connect to existing hospital 1984 SF Cooling Tower Enclosure and pedestrian walkway to South Garage
Partially enclosing the front porch area to add to the living room remodeling throughout of floors bathrooms closets and kitchen reinsulating the exterior walls and siding replacement. No change to im...
Interior finish out of first generation common corridor (7 day review)
Interior Remodel - retroactively permitting work that was previously completed addressing items in a issued code violation. Work will include work listed in expired permit 2024-092619 MP.
Finish Out for 2nd Floor 30608 SF - remodel to connect to existing hospital 1320 SF
7 DAY - Change of use and interior remodel to existing suite - OVA