Installation of temporary indoor structures consisting of a scenic arbor, a decorative trellis, and a performance platform.
Installation of construction fence shed as per plan. no change in use, egress or occupancy.
Installation of supported pipe scaffold as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Propose demolition of all interior non-structural partition walls. No mechanical demolition proposed. No change in use, egress or occupancy.
Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per drawings during new building work. no change in use, egress and occupancy. sidewalk shed and pipe scaffold to comply wit...
Installation of a material hoist as per drawings. hoist shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or egress under this application.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
File plumbing work type in conjunction with alteration job #q01270823-i1
Repair of existing facade. no change of use, egress or occupancy.
Remove and replace and install new AC Units as per plans submitted herewith.
Mechanical subsequent application for Q01198580-I1. Adding AC split systems
New Installation of one (1) floor drain , one (1) trench drain, two (2) shower heads, one (1) submersible sump pump to be connected to existing system. No change in use or egress.
Replacement of gas explosion damaged 4 exterior cmu, 6 elevator shaft cmu and 4 public hallway walls on 16th & 17th floors where shown on approved plans. no change in use, egress or occupancy.
Structural design for different structural components of this building as per plans filed herewith. no change in use, egress and occupancy,
General construction for 12th floor apartment renovations & window replacement, penthouse mechanical room, & dep required acm abatement as per plans filed herewith. no change in use, egress or occupan...
Full demolition to a three story building
Sprinkler modifications on the 20th floor as per plans filed herewith. No change to use, egress, or occupancy.
Cap & removed (1) gas meter, gas piping from cellar. cap & removed (1) gas range from 1st floor. install (1) dry well & (1) yard drain @ rear open space. no cheng in use egress & occupancy.
Stabilization plans and specifications filed in conjunction with nb #x01228219-i1.
Interior renovation of apartment 7q on the 7th floor. no change in use, egress, or occupancy.