Search Building Permits
134,933 permits
Outriggers system installation for facade repairs, no change in use, egress, or occupancy.
Mechanical work including electric split system and mechanical toilet and kitchen exhausts systems.
REMODEL
Proposed change of building's use from the existing two dweling units and one commercial unit to the proposed one dwelling unit and one commercial unit. work involves new interior partitions. a new ce...
Support of excavation to install catch basins in conjunction with dob job m01154293, m01310671 .no change in use, occupancy, or egress under this application.
Interior plumbing work: replace bathroom fixtures/finishes at 1st & 2nd floors; add new full bath in basement; modify kitchen island & sink; replace DHW heater with tankless WH-1; relocate gas dryer i...
File sprinkler work type in conjunction with alt.1 job filed under # 421410066.
General construction on floors 1-3 as per plans filed herewith. No changes in use, egress or occupancy.
Filing to remove shower in cellar to comply with ecb violations: 039163212l & 039163213n; and to replace water heater.
Replace detached garage roof framing. no change of use, egress or occupancy under this application.
File plumbing work type at basement, and cellar to cap/remove, bathroom/kitchen and install plumbing fixtures as per plan to address ecb violation #39114282x, and 39114283h. no change in use, egress o...
Herewith filing temporary construction fence
Subsequent structural application in conjunction with gc #b01043157-i1
Re-file work under 401179675 for change in non-bearing partitions in cellar to comply with ecb violation: 34260060y
File pl worktype in conjunction with job#x01298618
Remove and install minor non-load bearing partitions in apartment 4a on 4th floor in order to create a new bathroom and one bedroom. no chnage to use, egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Full demolition to a one story building
Filing of new 3-story building for school athletic facility as per plans filed herewith.
New stair floor opening to connect PHN to apartment 5A. Work involves installation of new header and trimmer.