Search Building Permits
134,065 permits
Roof replacement down to existing structural deck. Work includes installation of new continuous insulation, coverboard, and fully adhered membrane. Related parapet flashing and scupper replacement to...
Installation of suspended scaffold for facade inspection/repair.
Structural modifications as per plans filed herewith. No change to use, egress, or occupancy is proposed.
Interior renovation of existing 1 family dwelling. works include minor partitions. No change in use, occupancy, egress or bulk of building.
Install new paint wall and ceiling, new cement flooring. extend existing bar counter to 8'. install (5) display tv.
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Suspended scaffold installation and use as per plans filed herewith.
Mechanical work related to renovation of Apt. 8A as per plans filed herewith. No change in use, egress, or occupancy.
Non-structural exterior work to includes new masonry opening for installation of mechanical equipment; new louver in existing window opening; and replacement of existing louvers as per plans filed her...
York College PAC Bldg, Exterior facades leak investigation & repairs: Removal & replacement of the deteriorated CMU, install thru wall flashing, masonry joints, existing drainage piping and gaskets at...
Filing application for facade repairs. No change to use, egress or occupancy.
Plumbing work related to general construction work as per plans filed herewith.
Modifications to the existing sprinkler system on the 17th thru 21st floors (Louis Vuitton - North America Fit Out) as per plans. No change to use, egress or occupancy
Whitman #14, Exterior Roofing & Railing repairs: Removal/replacement/repairs of existing roofing membrane, flashing, masonry units, bulkhead door, sealant, spalled concrete and drains. Install guard r...
Mechanical work including electric split system and mechanical toilet and kitchen exhausts systems.
subsequent filing for Foundation work
Support of excavation (Berming, sloping, benching) associated with the parking lot.
(eplan) supplemental to 23014-10000-02947 to revise the 3rd floor additions and covered patio area and correct inventory.