Building Permits in ZIP 11101
Queens, NY — 684 permits filed recently
684 permits
Additions/Modification to the existing sprinkler system on the 3rd floor as per plans. No change to use, egress or occupancy.
Herewith filing for New seismic braces installation for Gas pipes. No change in use Egress of Occupancy.
Temporary shoring & bracing and partial demolition for the 1st floor opening to install new ramp going down to the cellar.
Herewith filing for new seismic braces installation for sprinkler pipes. No change in use Egress of Occupancy.
Installation of interior partitions at the ground floor
Filing for 8' high temporary construction fence. this application is for future new building and demolition. no change in use, egress and/or occupancy.
Temporary shoring & bracing and partial demolition for the 1st floor opening to install new ramp going down to the cellar.
Installation of interior partitions at the ground floor
Herewith filing for new seismic braces installation for sprinkler pipes. No change in use Egress of Occupancy.
Herewith filing for New seismic braces installation for Gas pipes. No change in use Egress of Occupancy.
Installation of a temporarily supported scaffold, heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a...
Repair or replace damaged sections of concrete walkways; remove and replace settled soils around perimeter of building to restore grade levels, repair minor interior slab on grade cracks in basement.
This project scope includes modification of the first floor,including slab leveling and finish removal. area of work is being combined from multiple demised tenancies into a single tenant. no change o...
PLUMBING WORK ON 2ND FLOOR BEAUTY SALON OF EXISTING 2-STORY BUILDING AS PER PLANS FILED HEREWITH, RELATED GENERAL CONSTRUCTION WORK HAS BEEN FILED INITIALLY. AND THIS FILING IS IN CONJUNCTION WITH ALT...
PLUMBING WORK ON 2ND FLOOR BEAUTY SALON OF EXISTING 2-STORY BUILDING AS PER PLANS FILED HEREWITH, RELATED GENERAL CONSTRUCTION WORK HAS BEEN FILED INITIALLY. AND THIS FILING IS IN CONJUNCTION WITH ALT...
Repair or replace damaged sections of concrete walkways; remove and replace settled soils around perimeter of building to restore grade levels, repair minor interior slab on grade cracks in basement.
This project scope includes modification of the first floor,including slab leveling and finish removal. area of work is being combined from multiple demised tenancies into a single tenant. no change o...
Installation of a temporarily supported scaffold, heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a...
Install new hvac system for 7 stories mix-use building with cellar subsequent with dob now#q00710146.no change of use, egress and occupancy.
Erect an illuminated business accessory wall sign. no change in use, egress, or occupancy.