Building Permits in ZIP 11101
Queens, NY — 684 permits filed recently
684 permits
Installation of 8ft high Plywood construction fence as per approved plans
Plumbing work filed in conjunction with alt-co renovation with rear horizontal addition. no change in use, occupancy or egress.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Modification to existing framing for Installation of new interior stair from 2nd to 3 floor and minor partition changes on 2nd floor. No change of egress, use or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy. the pipe scaffol on the southwest corner of the backyard from the floor to past top of the paraper wall.
Modification to existing framing for Installation of new interior stair from 2nd to 3 floor and minor partition changes on 2nd floor. No change of egress, use or occupancy.
Erect 69 Story new building. Required parking located on adjacent zoning lot.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary p/m hoist complex as per plans in conjunction with nb construction. no change in use, egress or occupancy. hoist shall comply with chapter 33 of nyc building code of 2022.
Interior modifications on construction floor 48 (marketing floor 50) as per plans filed herewith. No change to use, egress, or occupancy.
Interior modifications on construction floor 48 (marketing floor 50) as per plans filed herewith. No change to use, egress, or occupancy.
Modification to existing framing for Installation of new interior stair from 2nd to 3 floor and minor partition changes on 2nd floor. No change of egress, use or occupancy.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy. the pipe scaffol on the southwest corner of the backyard from the floor to past top of the paraper wall.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Erect 69 Story new building. Required parking located on adjacent zoning lot.
Installation of temporary p/m hoist complex as per plans in conjunction with nb construction. no change in use, egress or occupancy. hoist shall comply with chapter 33 of nyc building code of 2022.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.