Building Permits in ZIP 11354
Queens, NY — 472 permits filed recently
472 permits
Installation of solar panels, rooftop, grid tied, railed, 12 modules, 4.92 KW
Interior renovation
To replace hvac units with mechanical work for apt# 7b& 7d as per plan filed herewith. no change of use, egress or certificate of occupancy.
To proposed plumbing work as result of combination of existing apartment # 7b& 7d, in conjunction with dob now job q00754204-i1 as per plan filed herewith. no change of use, egress or certificate of o...
Structural scope of work includes installation ofa raised slab over the existing cellar floor to meetthe sidewalk, and support to atm's, safes & wheel chair lift for proposed commercial bankfit-out -a...
To propose combination of existing apartment unit #7b & 7d with general construction. as per plan filed herewith. no change of use, egress or certificate of occupancy. (local law 77 of1968)
Convert two car garage to one car garage. obtain new c of o.
Soe in conjunction with athletic field upgrade at flushing hs.
Installation plumbing work as per plan filed herewith. no change in use, occupancy or egress of building.
Installation of one 5 ton AC unit on roof.
Installation of solar panels, rooftop, grid tied, railed, 12 modules, 4.92 KW
Interior renovation
Vertical & horizontal extension of existing one family. obtain new c of o.
To replace hvac units with mechanical work for apt# 7b& 7d as per plan filed herewith. no change of use, egress or certificate of occupancy.
Propose a new two story with one family house. obtain new c of o.
Installation of tempopary plywood enclosure as per plan. no change in use,egress or occupancy. the plywood enclosure on street away 4 from the building facade. the dot permit filed by others.
Plumbing and sprinkler work in conjunction with tenant fit out. no change to use egress or occupancy.
Remove existing dry pipe sprinkler system at cellar level; Install new 4 sprinkler service and new wet pipe sprinkler system from cellar to 4th floor as per plans. There is no change on egress, use an...
Full demolition of existing 2-story fully detached residence.
Plumbing and sprinkler work in conjunction with tenant fit out. no change to use egress or occupancy.