Spring Scaffolding Llc
Permits (781)
Installation of temporary construction barriers as per plan. no change in use, egress or occupancy. the barricade is at east 82nd street and 3rd avenue elevations.
Installation of temporary plywood fence as per plan. no change in use, egress or occupancy. the plywood fence is beaver street and belvidere street elevations.
The pipe scaffold at the west ( jerome ave) and the east ( rear) elevation from the top of the sidewalk shed and from the ground to past the main roof parapet wall.
Insta of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy. the sidewalk shed columns will be placed on the roadway and permitted at dot at jerome ave elev. front of...
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Installation of temporary storage as per plan. no change in use, egress, or occupancy. the storage is top of the sidewalk shed e at east 70th street elevation.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. sidewalk shed along west 47th street frontage of 243 west 47th st, extending approx. 62 ft wit...
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Installation of temporary system stairs tower as per plan. no change in use, egress, or occupancy. the system stairs tower from the first floor to the eighth floor at east 82nd street elevation
Installation of temporary need beam/overhead protection.as per plan. there is no change in use, egress, or occupancy. the need beam system/overhead protection at the north elevation on the 8th floor o...
Installation of temporary needle beam / overhead protection as per plan. no change in use, egress, or occupancy. the needle beam overhead protection at 8th floor in the building
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at mott street and brommer street elevations.
Installation of temporary plywood fence as per plan. no change in use, egress, or occupancy. the plywood fence is attached to the sidewalk shed columns and located in front of the building on broome s...
Installation of temporary plywood fence as per plan. no change in use, egress, or occupancy. the plywood fence attached to the sidewalk shed columns front of the building.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy of the sidewalk shed at west 34th street,6th avenue, and west 33rd street elevations.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the sf from the top of the sh and the penthouse terrace past the main roof wall, around the bulkhead, setbac...
Installation of jersey barrier & plywood fence as per plans. the jersey barricade & fence to be installed on the roadway and shall be permitted at dot. no change in use, occupancy or egress under this...
Installation of temporary roof protection as per plan. no change in use, egress or occupancy. the roof protection is located on the east neighbor's and west neighbor's roofs.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary overhead protection as per plan. no change in use,egress or occupancy. the overhead protection is in the north neighbor's backyard.