Permits (781)
Installation of temporary pipe scaffold at the south (front) from the top of the sh bridge past the main roof parapet, north ( rear) elevation from the ground and setback to past main rf parapet.
Installation of temporary construction fence as per plan.
Installation of the sidewalk shed front of the building at 17 east 77th street
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at bailey avenue, west 193rd street, and heath avenue elevations.
Installation of temporary pipe scaffold at the south (front) from the top of the sh bridge past the main roof parapet, north ( rear) elevation from the ground and setback to past main rf parapet.
Installation of the sidewalk shed front of the building at 15 east 77th street
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at lafontaine avenue, east 180th street, and 181st street elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at east 178th st, bryant avenue, e treamont avenue, and boston road elevations.
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary construction fence as per plan.
Sidewalk shed proposed installation of sidewalk shed as per plan. no change in use,egress or occupancy.
Equipment use: single 7000 # capacity personnel hoist during nb const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator a...
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold is top of the sidewalk shed and passes the main roof parapet wall, building front of the...
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold is to the top of the sidewalk shed at east, west, north (to main roof level), south (from...
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancy
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at east 178th st, bryant avenue, e treamont avenue, and boston road elevations.