Spring Scaffolding Llc
Permits (781)
Installation of temporary beta hoist per plan. no change in use, egress, or occupancy. the beta hoist will be on 1st floor and roof.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold at the west neighbor's roofs/shaft to the top of the building.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold is at north, west and south elevations.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary overhead protection/ pipe scaffold as per plan. no change in use, egress, or occupancy.
Installation of temporary material hoist as per plan. no change in use, egress, or occupancy. the material hoist rack inside the building from the ground floor to the 2nd floor slab.
Installation of temporary material hoist as per plan. no change in use, egress, or occupancy. the material hoist rack inside the building from the ground floor to the 2nd floor slab.
Installation of temporary overhead protection/ pipe scaffold as per plan. no change in use, egress, or occupancy.
Installation of temporary shoring as per plan. no change in use, egress or occupancy
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Installation of temporary shoring as per plan. no change in use, egress or occupancy
The plywood fence at west 20th street and the chain link fence at the back of the building in the court yard,
The barricade with chain link fenc is at west 20th st on the road and west 21st st on the road to be installed on the roadway and shall be permitted at dot. no change in use, occupancy, or egress unde...
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed at the south elevation on east 16th street front of the building.
Temporary installation of sidewalk shed as per plan. no change in use, egress or occupancy.
The plywood fence at west 20th street and the chain link fence at the back of the building in the court yard,
Temporary installation of sidewalk shed as per plan. no change in use, egress or occupancy.
The barricade with chain link fenc is at west 20th st on the road and west 21st st on the road to be installed on the roadway and shall be permitted at dot. no change in use, occupancy, or egress unde...
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.the sidewalk shed at court street and douglass street elevations.