Spring Scaffolding Llc
Permits (787)
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.the sidewalk shed at court street and douglass street elevations.
The sidewalk shed at gradn street and west broadway elevations. installation of temporary custom color sidewalk shed as per plan. no change in use, egress ,or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.the sidewalk shed at court street and douglass street elevations.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancy
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. sidewalk shed located at sidewalk level along the front building face on east 87th street at 404 east 87th...
Equipment use: dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. e...
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. sidewalk shed located at sidewalk level along the front building face on east 87th street at 404 east 87th...
Equipment use: dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. e...
Equipment use: dual 7000 # capacity personnel hoists during bldg alteration, filed sep. hoistsshall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under thisapplication. eleva...
Equipment use: dual 7000 # capacity personnel hoists during bldg alteration, filed sep. hoistsshall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under thisapplication. eleva...
Equipment use: dual 7000 # capacity personnel hoist during bldg alteration, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elev...
Equipment use: dual 7000 # capacity personnel hoist during bldg alteration, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elev...
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the pipe scaffold in the shaft from the cellar to the 22nd floor
Installation of temporary roof protection as per plan. no change in use,egress, or occupancy.the roof protection at the east neighbor's roof and rear yard.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the pipe scaffold in the shaft from the cellar to the 22nd floor
Installation of temporary roof protection as per plan. no change in use,egress, or occupancy.the roof protection at the east neighbor's roof and rear yard.
Installation of temporary construction fence as per plan. no change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.