Spring Scaffolding Llc
Permits (787)
Installation of temporary construction fence as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at washington street and entrance.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at washington street and entrance.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary construction fence as per plan. no change in use, egress, or occupancy. the plywood fence at the 7th ave elevation at the main entrance from the ground below the canopy. the...
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary plywood fence as per plan. no change in use, egress, or occupancy. the plywood fence attached to the sidewalk shed front elevation and rear elevation. the fence free standing...
Installation of temporary construction fence as per plan. no change in use, egress, or occupancy. the plywood fence at the 7th ave elevation at the main entrance from the ground below the canopy. the...
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy, or egress under this application. the system sf is fully enclosed with plywood at...
Equipment use: dual 7000# capacity personnel hoist during bldg alteration, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevat...
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Equipment use: installation of dual 7000# capacity personnel hoists during nb filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. el...
Equipment use: installation of dual 7000# capacity personnel hoists during nb filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. el...
Equipment use: dual 7000# capacity personnel hoist during bldg alteration, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevat...
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at jane street.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold mock-up on the main roof.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold mock-up on the main roof.