Change of Use filed herewith on 1st floor and 1st floor Mezzanine (MZ1) for eating and drinking establishment.
Hereby filing structural and foundation work for new elevator shaft extension. In conjunction with enlargement under Alt-1#121208683. please see alt-1 for zoning and any enlargemen…
Hereby filing SOE for excavation at rear patio of existing building and adjacent building for installation of new exterior elevator pit
Provide temporary shoring to locally demolish existing masonry pier from 1st floor down to basement. no change in use, egress or occupancy.
Installation of interior non-load bearing partitions, doors/frames, flooring, ceilings and finishes as per plans filed herewith. No change in use, egress or occupancy under this ap…
Herewith filing for slab opening work and interior staircase and related structural as per the plans.
Construction work on the 21st floor (Marina B) as indicated on drawings.
Mechanical work on the 21st floor (Marina B) as indicated on drawings.
Demolish, cap & remove existing corroded utilities & fittings, install liquid injection waterproofing throughout the existing vaults. remove existing stairways, replace entrance do…
General construction for lobby renovation
Mh work filed in conjunction with dob now gc, sp, and pl. no change to use, occupancy or egress.
Minor interior renovation of suite 1100b. no change to use, occupancy or egress.
Hereby filing hvac system and related ductwork & piping per plans filed herewith. no change to use, egress or occupant
Mechanical work for lobby renovation
Structural modifications on MZ1 as per plans filed herewith. No changes in use, egress or occupancy.
Mechanical modifications on floors Cel, 01, MZ1, 02 as per plans filed herewith, including commercial kitchen rangehood ventilation system for Jack D's Steakhouse.