1015 Dozier Pl
Nashville · TN · 37216
Nashville · TN · 37216
To demolish the existing single-family dwelling and any accessory structures. Future construction under separate permit. Work per this permit must commence within thirty (30) days of issuance* and be completed sixty (60) days after commencement. This permit expires ninety (90) days of its issuance. Please call 811 before you dig. No construction and demolition waste will be stored on the property and the person demolishing a dwelling or structure is responsible to remove from the premises all demolition debris resulting from such demolition and to properly dispose of all demolition debris in an approved landfill. Not to be burned on lot.
Pipes burst during the recent ice storm causing the main living space to flood. Interior renovation, large loss insurance claim. No changes being made to the footprint of the home,…
Demo and remodel kitchen and 4 bathrooms. Update Framing, plumbing and electrical as needed. Replace existing windows and front door, with no modifications to size or location. Rep…