108 6th St SE, Washington, Dc 20003
Washington · DC
Washington · DC
Removing one interior wall to enlarge bathroom. Padding out wall against party wall to add sound-deadening material. Remove and haul fixtures and tile surround/wainscot. Installing new shower, vanity & storage cabinets, and tiling shower surround and floors.
1 other permit at 108 6th St SE, Washington, Dc 20003. Electrical, plumbing and HVAC on one property often share a GC, so follow the paper trail.
CFA / H Renovations to semi-detached dwelling to include replacement front stoop, repairing existing front windows on the first floor, and replacing windows at the second floor, re…
Replace fire alarm control panel and associated field devices. Replace the annunciator panels, booster panels, transponders and notification devices (speakers and strobes) in the b…