Washington, DC
Washington · DC
Washington · DC
1st floor lobby - partial floor improvement of the 1st floor [lobby] including: selective demolition and new construction -partition, mechanical, electrical, plumbing, ceiling, finishes, & life safety
2 other permits at Washington, DC. Electrical, plumbing and HVAC on one property often share a GC, so follow the paper trail.
11th FLOOR - BUSINESS CENTER: THE SCOPE OF WORK INCLUDES A NON-STRUCTURAL LEVEL TWO ALTERATION TO THE EXISTING ELEVENTH FLOOR. WORK INCLUDES PARTIAL DEMOLITION OF INTERIOR PARTITIO…
Removal of existing interior stairway connecting the kitchen (main level) to the second floor. Removal of existing partition walls in Bedroom #1 on the second floor to allow expan…
11th floor - spec suite scope of work includes a non-structural level two alteration to the existing eleventh floor. work includes partial demolition of interior partitions and fin…
Limited demolition and tenant improvement /alterations to interior build-out of partitions, ceilings, finishes, etc, and installation of furniture in existing vacant space. no stru…