Proposed work consist of excavation, shoring and underpinning. Scope includes installation of a temporary SOE system consisting of drilled, uncased soldier piles at max 8' O.C., with wood lagging and one tier of rakers/corner bracing, designed from existing or final grade -approx. Elev. 197- to bottom of foundation -approx. Elev. 188-. Scope also includes approx. 18 LF of concrete underpinning with pits up to 3' wide and 2' deep, performed from the exterior of the existing building, with spoils stockpiled at the designated location. As per plans, plat and documents.
Project consists of the renovation of a 2-story single-family detached residence with a gross interior square footage of 1,724 sf. It also consists of an addition of 401sf on level…
Interior work only Replace existing basement bath vanity Partially remodel existing kitchen Remodel existing master bath Remodel existing master closet Remodel existing 2nd floor h…