235 Greenough St
Philadelphia · PA · 19127
Philadelphia · PA · 19127
Minor demolition - for the complete demolition of an existing attached three (3) story structure. demolition to be done by hand only. all permitted demolition activity to be in accordance with site safety demolition plan and such plan to be maintained on site at all times in accordance with philadelphia administrative code. any deviation will require an amended permit. if site conditions vary, contact design professional prior to the start of any work. dust control measures to be utilized. *foundations and slab to be removed and site backfilled in accordance with b-3303.12 of the philadelphia building code.* *protection of pedestrians, public right-of-way, and adjacent properties to be in place prior to start of work.* *separate streets department approval required for right-of-way encroachment or closure. *
3 other permits at 235 Greenough St. Electrical, plumbing and HVAC on one property often share a GC, so follow the paper trail.
Minor demolition - for the complete demolition (>2/3rds of existing joists and at least one (1) exterior wall to be removed) of an existing attached structure. structure to be demo…
Full demolition - for the complete demolition of the existing structure to create a vacant lot.