311 Harvard St Se
Minneapolis · MN
Minneapolis · MN
renovation of common area amenities including level 1 lobby, level 2 leasing, level 3 dog run, levels 7 and 8 club room, study rooms and pool deck, and level 26 sky room. certificate of occupancy required: yes no mechanical plans required for certif
INSTALL STRUCTURAL SUPPLEMENT engineer: 54808 - Nevison, Patrick Richard Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED…
Installed new 1.5 ton mini split system for room 23- Data room in lower level. Condensing unit located in back alley, Sitting on wall bracket. (The applicant has been notified the…