5025 Just St NE, Washington, Dc 20019
Washington · DC
Washington · DC
All Interior Work, no structural work: First floor: Remodel existing kitchen and bathroom (pull and replace, existing rough ins to remain - no change). Second floor: Remodel existing bathroom (pull and replace, existing rough ins to remain). Add Washer- Dryer at 2nd floor.
CFA / H Renovations to semi-detached dwelling to include replacement front stoop, repairing existing front windows on the first floor, and replacing windows at the second floor, re…
Replace fire alarm control panel and associated field devices. Replace the annunciator panels, booster panels, transponders and notification devices (speakers and strobes) in the b…