Washington, DC
Washington · DC
Washington · DC
Historic District On Upper 3 Floors: Cut out and replace masonry mortar above the 3rd floor windows to the roof. Remove and replace the window perimeter sealant. Clean work area and adjacent surfaces. Rinse floors below work area.
Remove old metal roof from the rear roof and replace with New Fibertite roof membrane 36 mil off white color